Financed fund - 35.461.315 ALL (or 253.802,71 Euro)
Overall objective:
To contribute in guaranteeing an accessible-to-all-children education via an adequate structure that is appropriate for accommodating disabled children as well
Main activities of the project:
- Total renovation of the building used as nursery and day centre for the children in vulnerable situations (coming from low-revenue families, minority groups or the disabled) with a total area of about 700 m² and the accommodation of the area around of about 475 m²;
- Realisation of specific interventions to allow access to the disabled (ramps, toilets);
- Repairing of the drainage system and the electric monitoring unit;
- Construction of the boiler room and installation of the heating system in the school.